CRAFTED IN USA + SHIPS FROM USA

FREE SHIPPING ON ALL ORDERS!

100+ HAPPY CUSTOMERS!

               peel & stick...

peel & stick...

                                             & TRANSFORM YOUR SPACE IN NO TIME!

TRANSFORM YOUR SPACE IN NO TIME!

Draw guidelines on the wall:

Start by measuring the width of one wallpaper panel.

From the left edge of your wall,  measure that same distance out from the corner and lightly mark the spot with a pencil.

This mark will help you draw a straight vertical guideline, ensuring your first panel goes up perfectly aligned.

guide your first panel.

Place your level on the pencil mark and draw a straight vertical line from ceiling to floor.This will guide your first panel. 

This is the Guide Line for your first strip. 

Never align a wallpaper with a wall corner on the starting strip: 

they may not be perfectly straight.

 

This is a very important step, because, if the first sheet is not perfect as you continue Installation misalignment will increase. 

Prepare the First Panel: 

Choose the top edge of the first sheet and ensure the pattern is upright.

Peel back one corner to begin.

Peel & Prepare:

Peel back about 3 inches of the backing paper from the top of the panel.

Fold it down to expose the adhesive this section will help you start 

positioning the wallpaper on the wall.

Position the Top of the Panel:

Gently press the exposed adhesive at the top of the wallpaper onto the wall, leaving a small overlap at the ceiling—this will be trimmed later.

Lightly smooth it in place without applying full pressure. 

 

Align the right edge of the wallpaper with the left side of your vertical guideline. 
Double-check that it’s straight. 

If it’s not, carefully lift and reposition before 

moving forward.

Peel & Smooth the Wallpaper:

Slowly peel the backing paper down 5–10 inches at a time.
As you go, check that the right side of the sheet stays aligned with the guideline.
 

Gently smooth the wallpaper onto the wall, 

starting from the center and working outward.

If the wallpaper shifts out of alignment, carefully lift it andreposition.

Apply the Next Panel:

Take the next sheet of wallpaper and position it so that the left edge overlaps the right edge of the previous panel by about half an inch.
 

Carefully align the pattern repeat.
Continue applying additional sheets, making sure to match the pattern with each new strip.

Pattern  Repeat Info

Select your next sheet of wallpaper and apply it so that its left side overlapsthe right side of the previous sheet by 1/2” {half inch} 

carefully matching the repeat.

Using the same procedures apply more 

wallpaper sheets, 

matching the pattern to the previous strip.

bubbles

trim wallpaper

care

bubbles

When installing your wallpaper, air will most 
likely get trapped in between, just puncture
the bubble with a small pin or the tip of the 
blade and gently flatten out the paper with 
the plastic smoother.

trim wallpaper

Trim the excess paper along the ceiling 

and baseboard. 
Always use a sharp knife or blade for every 
cut and do not tilt your knife when making 
long cuts.

care

Our Wallpapers are washable, to clean them you can use a wet sponge, kitchen towel or damp cloth, 

use only mild detergents. 
Don’t use abrasive cleaners & don’t scrub the paper. 
Do not expose them to a direct flame or constant heat. 
Constant humidity exposure can shorten 

the product life time.

key installation guidelines

 Take time to carefully read all instructions before beginning the installation of your peel-and-stick wallpaper.

While we love seeing our customers take on DIY projects, if you’re thinking about hiring a professional, make sure

they’re familiar with self-adhesive wallpaper specifically.

Wallpapering is best done with two people. For optimal results, aim to complete the full installation in one go.

don’t leave it halfway done. Allocate about 30 minutes per panel.

Your wall should be smooth, clean, dry, and in good condition—free from dust, grease, mildew, or any surface damage. 

Remove items like vents, outlet covers, or hooks beforehand. Avoid applying wallpaper on surfaces prone to moisture 

or mold. Newly painted or constructed walls need a minimum of 30 days to cure fully and should be properly primed and 
sealed. If you notice mold, high moisture, or raw concrete, don’t proceed until the wall is treated and prepped correctly. 

It’s the installer’s responsibility to check wall readiness.

Ensure your wall is completely free of debris, smooth to the touch, and dry before you begin. 
Wipe it clean and give it time to fully dry. Never apply over existing wallpaper.

If the wall has been recently painted or primed, hold off. Even dry paint continues to release gases as it cures, which can 

cause the wallpaper to lose adhesion over time.

Unroll your wallpaper panels at least 48 hours prior to installation so they can acclimate to room temperature & humidity. 

Before hanging, double-check the color, pattern, and sequence. Confirm consistency and alignment before you begin.

If your wallpaper is labeled with roll numbers, install in order starting with the lowest number first.

Begin your installation on the left side of the wall and work your way right.

The first panel sets the tone—take your time to align it perfectly straight and level. 

Nailing this first step makes the rest of the installation much easier.

peel, stick & stay updated!

Be the first to know about new collections & exclusive offers.

Thanks for contacting us. We'll get back to you as soon as possible.

FAQ

Contact

© 2025, WALLPAPER CUSTOMS. All rights reserved.